Docket Room
S 3739·NJ·senate

Establishes certain electric vehicle supply equipment development processes and standards concerning public health and safety; removes certain existing approval requirements while preserving applicable safety and inspection standards.

Passed Both ChambersFiled Mar 5, 2026
Sponsor: Diegnan, Patrick J., Jr.
Latest Action

Passed Senate (Passed Both Houses) (27-11)

Jun 30, 2026

Summary

The measure lets owners of gasoline stations, retail stores and other existing buildings install electric‑vehicle charging equipment or make‑ready parking spaces without needing site‑plan or variance approvals. Approvals become a ministerial, non‑discretionary permit if the project follows the State Uniform Construction Code and applicable safety rules, and local inspections still apply. The intent is faster, uniform permitting without lowering public health or safety protections.

AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.

Share

Track this bill

Get real-time alerts when S 3739 changes status, plus AI-powered summaries and stage predictions.

Sign up free
Docket Room · Nonpartisan legislative tracking
Docket Room IntelligencePro

Ask about your legislation

I can analyze your tracked bills, upcoming hearings, and recent changes.

AI-generated · Nonpartisan · Not legal advice