Establish setback from residential properties for new windmills being constructed throughout the state.
To House Energy and Public Works
Summary
The bill adds new rules that the Public Service Commission must follow before issuing a siting certificate for a wind energy system. It mandates that each turbine be placed at least 1.1 times its total height away from any non‑owner’s property line or a public road, and at least 1.5 times its height from any residence, unless the landowner signs a waiver. The measures apply to new systems larger than 500 kW and do not affect modifications to certificates issued before the law takes effect.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when HB 5069 changes status, plus AI-powered summaries and stage predictions.
Sign up free