Referred to the House Committee on Energy and Commerce.
Summary
The POWER Act orders the Department of Energy, in consultation with the EPA, to produce a report on how covered data centers consume electricity and water. The report is due two years after the law’s passage and then annually, detailing water drawn from public systems, on‑site power generation, consumer status, and connection costs. The goal is to ensure data centers do not strain water resources or receive hidden subsidies.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when HR 9019 changes status, plus AI-powered summaries and stage predictions.
Sign up free