Docket Room
HR 8113·Federal·house

To direct the Secretary of the Interior to carry out a feasibility study on a selective water withdrawal system at Glen Canyon Dam, and for other purposes.

In CommitteeFiled Mar 26, 2026
Sponsor: Rep. Maloy, Celeste [R-UT-2] (R)
Latest Action

Referred to the House Committee on Natural Resources.

Mar 26, 2026

Summary

The bill orders the Secretary of the Interior, through the Reclamation Commissioner, to complete a feasibility study on a selective water withdrawal system at Glen Canyon Dam within 18 months. It involves the Energy Secretary and power contractors and funds the study with existing appropriations. If the study shows the system is feasible and contractors agree, construction could move forward.

AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.

Share

Track this bill

Get real-time alerts when HR 8113 changes status, plus AI-powered summaries and stage predictions.

Sign up free
Docket Room · Nonpartisan legislative tracking
Docket Room IntelligencePro

Ask about your legislation

I can analyze your tracked bills, upcoming hearings, and recent changes.

AI-generated · Nonpartisan · Not legal advice