Nuclear-powered electric generating facilities in Minnesota potential evaluation study appropriation
Referred to Energy, Utilities, Environment, and Climate
Summary
The bill directs the Public Utilities Commission to hire the Great Plains Institute to conduct a comprehensive study on constructing nuclear‑powered electric generating facilities in the state. It provides funding from the renewable development account for fiscal year 2027 and requires the study to be finished by June 30 2027, with results sent to the energy‑related legislative committees. The analysis must cover licensing, technology, small modular reactors, siting, waste, economic and safety impacts.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when SF 4900 changes status, plus AI-powered summaries and stage predictions.
Sign up free