Docket Room
SB 931·MI·senate

Public utilities: electric utilities; new electronic transmission infrastructure; require to use existing rights-of-way. Amends sec. 7 of 1995 PA 30 (MCL 460.567).

In CommitteeFiled Apr 23, 2026
Sponsor: Sam Singh
Latest Action

REFERRED TO COMMITTEE ON ENERGY AND ENVIRONMENT

Apr 23, 2026

Summary

The bill requires any electric utility serving 50,000 or more residential customers, its affiliated transmission company, or an independent transmission company to apply to the state commission for a certificate before building a major transmission line. The application must include detailed route information, cost, benefits, health and safety impacts, and an evaluation of alternate routes, especially looking at using existing rights‑of‑way or collocating with current lines. This aims to ensure thorough review and limit new land disturbance.

AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.

Share

Track this bill

Get real-time alerts when SB 931 changes status, plus AI-powered summaries and stage predictions.

Sign up free
Docket Room · Nonpartisan legislative tracking
Docket Room IntelligencePro

Ask about your legislation

I can analyze your tracked bills, upcoming hearings, and recent changes.

AI-generated · Nonpartisan · Not legal advice