Docket Room.
← Federal regulations
2026-21030·NUCLEAR REGULATORY COMMISSION

AP1000 Design Certification Renewal

Corrected: C1-2026-21030, published Nov 12, 2026 — corrects this document.
Final RuleFinal Rule
Published
Oct 14, 2026
Effective
Dec 28, 2026
Comments closed
Nov 13, 2026
Citation
91 FR 65091
Docket
NRC-2026-2377

Direct final rule and issuance of environmental assessment.

Summary

The Nuclear Regulatory Commission (NRC) is updating its rules to renew the design certification for the AP1000 nuclear reactor and to add the latest design changes captured in Revision 20 of the AP1000 design‑control document. The update reflects modifications that were made while licensing, building, and operating the Vogtle Electric Generating Plant’s Units 3 and 4, ensuring the certified design matches the version that has already been constructed and proven in the field. The rule applies to any current or future nuclear power projects that plan to use the AP1000 design, as well as to utilities, engineers, and suppliers working on licensing, construction, or operation of such reactors. By incorporating the most recent, construction‑validated design, the NRC aims to streamline future approvals and maintain safety standards based on real‑world experience. The direct‑final rule was published on October 14, 2026, and takes effect on December 28, 2026. Interested parties may submit comments until November 13, 2026. After the comment period closes, the NRC will review any feedback, finalize the rule if necessary, and the updated certification will become the reference for all AP1000 projects moving forward.

AI-generated summary — verify against the Federal Register text.

Official abstract

The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations to renew the AP1000 design certification and incorporate Revision 20 of the AP1000 design control document. The purpose of this rulemaking action is to update the AP1000 design to be consistent with changes made to the design during the licensing, construction, and operation of Vogtle Electric Generating Plant, Units 3 and 4. This rulemaking incorporates AP1000 design control document Revision 20, which includes updates made to the AP1000 design to represent a current, construction-validated design. The NRC is also issuing an environmental assessment supporting this rule.

Topics

EnergyClimate & EnvironmentInfrastructure

Share

Track this rulemaking

Get alerts when this document changes status or its comment period closes, plus the bills that connect to it.

Sign up free
Docket Room · Nonpartisan legislative tracking
Docket Room IntelligencePro

Ask about your legislation

I can analyze your tracked bills, upcoming hearings, and recent changes.

AI-generated · Nonpartisan · Not legal advice