Assigned Chapter Number 70
Summary
The bill directs Wyoming’s state engineer to perform a groundwater study in each county with a designated water‑control area at least once every decade, and to make the findings public and report them to a joint water resources committee. An initial study must be finished by June 30 2028, funded with $250,000 from the general fund. The measure aims to better understand water consumption and recharge needs for residential development.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when SF 50 changes status, plus AI-powered summaries and stage predictions.
Sign up free