H Did not Consider for Introduction
Summary
The bill forces operators of DC fast‑charging stations to put a 3‑by‑3‑inch label on each charger that shows the largest energy resource category (such as coal, wind or solar) that supplied the station’s power in the previous calendar year. If no single source made up at least 50 % of the electricity, the label must list the two top sources. Violations are misdemeanors punishable by a fine of up to $750, and the rule would begin on July 1 2026.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when HB 158 changes status, plus AI-powered summaries and stage predictions.
Sign up free