Governor Signed
Summary
HB 348 changes how the state engineer charges fees for water‑related applications, directing those fees to a dedicated credit for the Division of Water Rights. It also establishes a clear, same‑day notification process for approving or rejecting dedicated water applications and outlines the proof‑of‑appropriation reporting required after construction. The changes aim to improve transparency and ensure dedicated water rights are managed consistently.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when HB 348 changes status, plus AI-powered summaries and stage predictions.
Sign up free