SB 1610·AZ·senate
groundwater; transporting requirements; technical correction
In CommitteeFiled Jun 12, 2026
Sponsor: T.J. Shope (R)
Latest Action
Senate First Reading
Jun 12, 2026
Summary
The bill requires that only entities with a Central Arizona Project water delivery contract and proven ability to handle the water can count transported groundwater toward an assured supply. Entities without such a contract cannot use the water for that purpose. An exception is made for groundwater from the Big Chino sub‑basin.
AI-generated summary — may be incomplete or inaccurate. Verify against the official bill text.
Track this bill
Get real-time alerts when SB 1610 changes status, plus AI-powered summaries and stage predictions.
Sign up free